Description
Rehab in progress on home in Renton. We are couple days away from being ready for tile.
Tile scope:
Master shower 48 sq ft.
Full Shower 88 sq ft.
Full bath 78 sq ft
Fireplace 1, 80 sq ft
Fireplace 2, 60 sq ft
- Carpenters needed for cabinet install, trim install, engineered floor install.
- Countertops needed for fabrication, dimension cuts for range/sink/etc..., and install.
- Framing in ceilings to be ready for ceiling drywall. Drywall ceiling install (living room, bedroom, part of bathroom).
Discussion
By posting you agree to the Terms and Privacy Policy.