Description
have 3 (100’) trenches and 2 (10x10) areas to pour. all inside work. trenches are 2 feet wide with floor drains. shoukd only take a half day. just screed off top. then once over with mag or steel trowel. nothing fancy or perfect. about 9 yards.
Discussion
By posting you agree to the Terms and Privacy Policy.