I need about a 15 ft x 35 ft area dug down 6 inches mesh laid down for mole control and dirt replaced. Also need area graded and raked and rocks removed. Area previously tilled and dirt is not too hard.
I would like to schedule the work for Saturday August 31st. Should not take more than a day to complete.
This Saturday should be cloudy and a little cooler.
I would like a couple of references to verify ability and willingness to work. This is not a terribly strenuous or difficult project.