Need Baseboard and Casing Installed

Jobs

Patterson Bridge near Coastal highway, Bethany Beach DE

Description

Condo owner needs 40-60 feet of 6” pine (1 by) baseboard installed and 4” pine (1 by) casing around both sides of four doors. Primed one by is specified in 6” and 4” widths. Casing and baseboard to be caulked and nail holes puttied.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area