Bobcat, dump trailer, concrete work

Jobs

San Diego CA

Description

I have a two phase job. First is to move some dirt from my front yard (about 20 yards) and get rid of it, basically lowering the yard and make room for a driveway extension. Next is concrete work, need a driveway widened about 4 feet, a pad that is 8 x 20, another pad, 21 x 13, and about 24 small pads that will be stepping stones (3 x 5). Total square footage is just under 1000. Just a broom finish. I've attached drawings so you can get the feel of the project. Will need to fill out a 1099 for this job. Budget for both phases is $6,700 for labor and materials.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area