I need to remove about 1-2 inches of weeds and dirt from 500 square foot area to install gravel and stepping stone patio. Some experience preferred. Specifically, you will need to use a shovel or sod cutter to remove the weeds and top inch of dirt.
$20 per hour.
Discussion
By posting you agree to the Terms and Privacy Policy.