Need new bath plumbing rough-in; hook-up

Jobs

Pittsburgh PA

Description

Plumbing Contractor needed We are installing a second bath in a 2 BR unit in Shadyside; work to begin by July 7-10 (+/-). It will need rough-in of vanity, toilet and shower stall. We will do the work around it (drywall, tile, etc.,), then the plumber can return to do the hook-ups and connections. Work should be finished by mid-July at latest. Existing plumbing is directly in the next wall as the neighboring apartment has its bathroom there. We will be on site to have the floors and walls open where needed to expedite. If you are interested and available, we’d like to hear from you. Thanks, and best wishes. 412-491-6354

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area