Description
I completely demoed my front bedroom to the studs and vaulted the ceiling. Approximately 12x12 room, 12 ft high in the center. 2x6 rafter support boards have to be sistered in to the existing rafters so the insulation will fit. Electrical has been installed but outlets need to be attached. 4 Canned lights to be installed in ceiling. Insulation stapled in then drywalled. I have all materials including Baker lifts. Only experienced with own tools need apply.
520 420 0038
Discussion
By posting you agree to the Terms and Privacy Policy.