Description
See pictures for equipment.
Construct all new ducts, R-8 with Lines sets, drains, boxes and grills. 8 drops in attic. Construct plenum, install drain pan, connect air handler to existing drain line, install float switch.
Outside unit is installed on existing platform. Connect AC whip to non-fused service disconnect box. Pictures of equipment attached.
Text me if interested. You can stop by on the job to discuss details.
Discussion
By posting you agree to the Terms and Privacy Policy.