Description
Addition is being built and the foundation has already been dug up. Foundation for the addition is 125 SF. Concrete is needed to be poured into the 3 ft deep footings and the slab for the foundation. Services needed: Concrete material and pouring of the concrete material. Needing to be done ASAP.