Description
provide proposal to demo and remove from property the existing old concrete dock piles and dock and build the new dock per the attached drawing. For the walk boards quote the composite material. Please quote the piles for lift in the base quote and the lift itself as an option. do not quote water or electric.
Please include pinellas county permit too. The water depth at the seawall averages about 3-5 ft. and at the end of the existing dock it is approx. 6-8 ft.
Discussion
By posting you agree to the Terms and Privacy Policy.