Rehab 20 units in an apartment complex in Dickinson + MEP Work

Jobs

Dickinson TX

Description

Apartment Rehab - 20 Units - Plus Electrical, Plumbing and HVAC work Location: Courtyard Apartments - 3206 Lobit Drive, Dickinson, Texas 77539 Looking for: Electrical Contractor HVAC Contractor Roofing Contractor Exterior Painting/Carpentry Contractor Drainage Contractor Plumbing Contractor Asphalt Contractor Interior Finish Contractor (Drywall work, Doors/Frames/Hardware, Floor tile work, Kitchen cabinets and bathroom vanities, Refinish bathtubs, Counter tops, texturing and painting, Closet shelves/rod, Bathroom accessories, Window blinds, Set appliances, Coordinate work with the MEP Contractors, Etc..... Appliance Supplier Note: General Contractors are welcomed Property Description: 3 buildings (A, B and D) rehabbing the bottom floors only. Rehabbing 20 units on the first floor. Building A1 has - 1st floor 2 - 1 bed/1bath (approx. 655sf) 4 - 2 bed/1 1/2 baths (approx. 825sf) 2 - 3 bed/1 bath (approx. 980sf) Buildings B1 has: 6 - 2 beds/1 bath (approx. 755sf each) Building C has no units to be finished out except electrical meter conversion and replacing all the ac condensers and air handlers. Building D1 has: 6 - 2 beds/1 bath (approx. 755sf each) Scope of Work: 1. New asphalt parking lot. Includes striping and car stops. 2. New roofs - Deferred for a later date 3. Replace exterior rotten wood power wash and repaint 4. Rework courtyard drainage 5. Convert electrical meters so tenant pays for their own electric (convert 24 meters from master) 6. New HVAC condensers and air handlers (check out ductwork and support stand for the air handler). 1st floor: Replace condensers and air handlers and check ductwork and check copper and support stand for the air handlers and electrical disconnects (28 units). 2nd floor: Replace condensers and air handlers (29 units). Currently the 2nd floor units are rentable as is. 7. Rehab 28 unfinished units on the first floor only on buildings A, B, C and D. Interior finish work to include: Sheetrock work, Interior paint, Cabinets, Countertops, Kitchen sink, and Faucet, Baseboards, Interior doors, Casings, Vanities, Toilets, Tub surround, Shower valve, Bathtubs to be refinished, Wiring, New receptacles and switches, Flooring/18" Ceramic tile, Window blinds, Appliances (stove/oven/fan, refrigerator), Light fixtures, Bathroom mirrors, Doors/frames/hardware, Bathroom accessories, Replace front doors if necessary, etc. (A complete interior finish for tenant move-in). Demolition was completed on the initial rehab. Note: Price each unit separately. Note: Use unit 30 in Building C as the mock up for the pattern and finishes. Note: Appliance package - Stove appliances some units has gas and the others electric. For 20 units 9. The initial rehab was started but never finished. The rehab was permitted and the original permit is posted on the window on the 1st floor on Building B. This permit has expired. New permits will be required. 10.Utility set up: Electrical Building A half on master and half on individual meters (convert the master meters to individual meters) Building B all on master meter Building C half on master and half on individual (convert the master meters to individual meters) Building D all on individual meter Gas Building A all electric Building B all gas Building C half on gas Building D all electric Note: Appliances to match for gas or electric. 11. General Pee traps to comply with code AC condenser disconnects comply with code Air handler disconnects comply with code Interior wiring, outlets and switches comply with code Breaker box to comply with code All work to comply with code Work "projected" to start June 1, 2021. Building A 1st Floor A1 2x1.5 825sf A2 2x1.5 825sf A3 1x1 655sf A4 3x2 980sf A5 3x2 980sf A6 1x1 655sf A7 2x1.5 825sf A8 2x1.5 825sf 8 units 6570sf Building B 1st Floor B17 2x1 755sf B18 2x1 755sf B19 2x1 755sf B20 2x1 755sf B21 2x1 755sf B22 2.1 755sf 6 units 4530sf Building C 1st Floor C29 C30 C31 C32 C38 C39 C40 C41 8 units Building D 1st Floor D46 2x1 755sf D47 2x1 755sf D48 2x1 755sf D49 2x1 755sf D50 2x1 755sf D51 2.1 755sf 6 units 4530sf Rehab 20 units 15630sf Total 57 units Call Wayne for more information 713-822-8171 Contractors can go to the property at any time. THERE IS AN ONSITE MAINTENANCE MAN (BILL) ON THE PROPERTY. Bill can walk the property with him. CALL WAYNE IF YOU HAVE QUESTIONS 713-822-8171. Please send your proposal to: 360 Realty & Property Management P.O. Box 841602 Houston, TX 77284 Or drop it off at: 16111 Cairnway Drive #210 Houston, Texas 77084 Or email

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area