We have replaced all of our condensers and air handlers. We have added a new zone to a dual fuel system. Electric heat pump is the primary system and oil boiler is the secondary system. We need a plumber to add a fourth zone for our basement. You need to do the following:
- Add a new zone to boiler for a hot water coil on top of a heat pump that will be part of addition
- All equipment has already been changed out
- You need to pump down the boiler, drain the boiler, refill it with water
- We have a 60,000 BTU coil
- You need to add Taco Zone valve
- install 60 feet of pipe
Let me know what you would charge for the job and whether you have a plumber license.