Apartment Rehab - 20 Units
Jobs
Dickinson TX
Description
Location: Courtyard Apartments - 3206 Lobit Drive, Dickinson, Texas 77539 Looking for: Electrical Contractor HVAC Contractor Roofing Contractor Exterior Painting/Carpentry Contractor Drainage Contractor Plumbing Contractor Asphalt Contractor Interior Finish Contractor (Drywall work, Doors/Frames/Hardware, Floor tile work, Kitchen cabinets and bathroom vanities, Refinish bathtubs, Counter tops, texturing and painting, Closet shelves/rod, Bathroom accessories, Window blinds, Set appliances, Coordinate work with the MEP Contractors, Etc..... Appliance Supplier Property Description: 3 buildings (A, B and D) rehabbing the bottom floors only. Rehabbing 20 units on the first floor. Building A1 has - 1st floor 2 - 1 bed/1bath (approx. 655sf) 4 - 2 bed/1 1/2 baths (approx. 825sf) 2 - 3 bed/1 bath (approx. 980sf) Buildings B1 has: 6 - 2 beds/1 bath (approx. 755sf each) Building C has no units to be finished out except electrical meter conversion and replacing all the ac condensers and air handlers. Building D1 has: 6 - 2 beds/1 bath (approx. 755sf each) Scope of Work: 1. New asphalt parking lot 2. New roofs - Deferred for a later date 3. Replace exterior rotten wood power wash and repaint 4. Rework courtyard drainage 5. Convert electrical meters so tenant pays for their own electric (convert 24 meters from master) 6. New HVAC condensers and air handlers (check out ductwork and support stand for the air handler). 1st floor: Replace condensers and air handlers and check ductwork and check copper and support stand for the air handlers and electrical disconnects (28 units). 2nd floor: Replace condensers and air handlers (29 units). Currently the 2nd floor units are rentable as is. 7. Rehab 20 unfinished units on the first floor only on buildings A, B and D (No work finish work to be done in Building C). Interior finish work to include: Sheetrock work, Paint, Cabinets, Counter tops, Vanities, Toilets, Bathtubs to be refinished, Wiring, New receptacles and switches, Flooring/18" Ceramic tile, Window blinds, Appliances (stove/oven/fan, refrigerator), Light fixtures, Bathroom mirrors, Doors/frames/hardware, Bathroom accessories, etc. Demolition was completed on the initial rehab. Note: Use unit 30 in Building C as the mock up for the pattern and finishes. Note: Appliance package - Stove appliances some units has gas and the others electric. For 20 units 9. The initial rehab was started but never finished. The rehab was permitted and the original permit is posted on the window on the 1st floor on Building B. This permit has expired. New permits will be required. 10.Utility set up: Electrical Building A half on master and half on individual meters (convert the master meters to individual meters) Building B all on master meter Building C half on master and half on individual (convert the master meters to individual meters) Building D all on individual meter Gas Building A all electric Building B all gas Building C half on gas Building D all electric Note: Appliances to match for gas or electric. 11. General Pee traps to comply with code AC condenser disconnects comply with code Air handler disconnects comply with code Interior wiring, outlets and switches comply with code Breaker box to comply with code All work to comply with code Work "projected" to start June 1, 2021. Building A 1st Floor A1 2x1.5 825sf A2 2x1.5 825sf A3 1x1 655sf A4 3x2 980sf A5 3x2 980sf A6 1x1 655sf A7 2x1.5 825sf A8 2x1.5 825sf 8 units 6570sf Building B 1st Floor B17 2x1 755sf B18 2x1 755sf B19 2x1 755sf B20 2x1 755sf B21 2x1 755sf B22 2.1 755sf 6 units 4530sf Building C No finish build out. Buildiing D 1st Floor D46 2x1 755sf D47 2x1 755sf D48 2x1 755sf D49 2x1 755sf D50 2x1 755sf D51 2.1 755sf 6 units 4530sf Rehab 20 units 15630sf Total 57 units Call Wayne for more information 713-822-8171
Discussion
By posting you agree to the Terms and Privacy Policy.