Plumbing and Electrical and HVAC Contractors

Jobs

Dickinson TX

Description

Rehab Apartment Complex in Dickinson, Texas 77539 Rehabbing an existing apartment flooded by Harvey in Dickinson, Texas 77539. 4 buildings (A, B and D) rehabbing the bottom floors only. Building A1 has - 1st floor 2 - 1 bed/1bath (approx. 655sf) 4 - 2 bed/1 1/2 baths (approx. 825sf) 2 - 3 bed/1 bath (approx. 980sf) Buildings B1 has: 6 - 2 beds/1 bath (approx. 755sf each) Building D1 has: 6 - 2 beds/1 bath (approx. 755sf each) Scope of Work: 1. New asphalt parking lot 2. New roofs 3. Replace exterior rotten wood power wash and repaint 4. Rework courtyard drainage (it does not drain) 5. Convert electrical meters so tenant pays for their own electric (convert 24 meters from master) 6. New HVAC condensers and air handlers (check out ductwork and support stand for the air handler). 1st floor: Replace condensers and air handlers and check ductwork and check copper and support stand for the air handlers (28 units). 2nd floor: Replace condensers and air handlers (29 units). Currently the 2nd floor units are rentable as is. 7. Rehab unfinished units on the first floor only on buildings A, B and D (Including new sheetrock, paint, cabinets, counter tops, vanities, toilets, bathtubs, wiring, receptacles, switches, flooring/tile (1st floor), window blinds, appliances (stove/oven/fan, refrigerator), light fixtures, mirrors, doors/frames/hardware, bathroom accessories, etc.). Demolition was completed on the initial rehab. Note: Use unit 30 in Building C as the mock up for the pattern and finishes. Note: Bidders to walk the property to confirm scope of work. Note: Appliance package - Stove appliances some units has gas and the others electric. Note: Price each unit rehab by each building (Bldg. A, Bldg. B and Bldg. D) Note: Use the unit 30 in Building C as the mock up pattern and finishes. 1st floor flooring tile and the 2nd floor flooring wood laminate or vinyl planks or carpet) 9. The initial rehab was started but never finished. The rehab was permitted and the original permit is posted on the window on the 1st floor on Building B. This permit has expired. New permits will be required. NOTE: CONTRACTORS TO PRICE EACH BUILDING SEPARATELY. MAY AWARD WORK TO A CONTRACTOR PER BUILDING OR ALL THE BUILDINGS TOGETHER. Contractor can bid on all or you choice which area of work you want to do. Contractor can buy the materials or you can hook us up with the supplier and can pay supplier direct. But material cost needs to be included in Contractors bid. Contractor to furnish a break down for each area of work. Contractor will provide a scope of work and a time line schedule. May choose several contractors to do the work in different areas or by buildings. Price the unit rehabs for each building. Bldg. A Bldg. B Bldg. C and Bldg. D. Will pay out the contractor for their labor on a weekly bases based on the work completed. No up front money. Work "projected" to start June 1, 2021. LOCATION COURTYARD APARTMENTS 3206 LOBIT DRIVE DICKENSON, TEXAS 77539 Contractors can go to the property at any time. THERE IS AN ONSITE MAINTENANCE MAN (BILL) ON THE PROPERTY. Call Bill to schedule a time to walk the property with him. His number is 719-822-9965. CALL WAYNE IF YOU HAVE QUESTIONS 713-822-8171. Please send your proposal to: 360 Realty & Property Management P.O. Box 841602 Houston, TX 77284 Or drop it off at: 16111 Cairnway Drive #210 Houston, Texas 77084 Or email: [email protected] P.S. We are also a full service real estate company that specializes in single family houses and apartments. Our Maintenance Department is always looking for good contractors to help them with their maintenance tenant work order repairs and tenants make ready’s.

By:  view source

Discussion

By posting you agree to the Terms and Privacy Policy.

/
Search this area