Description
I need a 90 ft sequoia cut down.
It is very close to a structure/home (within 1 ft).
It would need about a 70 foot walk down grade to the chipper; no bucket or other machinery will fit along the house
looking for it to be done on a weekend.
You need very good skill + be insured/bonded for this work. References will be required.
Lets get it done.
Discussion
By posting you agree to the Terms and Privacy Policy.