• Cut and remove vegetation from within pond basin, sand filter, and outfall area. Woody
vegetation will by disposed off-site.
• Cut and remove vegetation from around the flow splitter box. Remove cut material and
dispose off-site.
• Excavate and remove up to 5 CY of sediment from within the flow splitter structure.
Dispose off-site.
• Excavate and remove the top 4” of filter media within the filtration basin (+/- 680 sf).
Approximately 10 CY of materials will be removed. All materials will be disposed at a
suitable, offsite location.
• Import and install +/- 4” of sand on top of existing filter media.
• Repair any damage cleanouts/observations wells.
• Remove any materials/obstructions blocking the control structure.
• Repair up to 20 SY of erosion with topsoil, seed, and stabilization matting.
• Stabilize disturbed areas with ECM p