Description
This is pretty basic work -- I just need someone to dig approx 550 1' deep x 3" diameter post holes (using a power post hole digger that I am going to rent) for a pretty big deck I am building in Joshua Tree.
Then need 4' x 4" diameter posts placed in holes, so all posts are level @ 3' height.
Then screw 4' x 8' plywood sheets to tops of posts.
You don't necessarily need to have deck building experience, but you do need to be able to use a post hole digger, know how to make sure something is level and have some basic tools if possible (e.g., hammer, electric drill, framing hammer or small sledge hammer for pounding in posts, measuring tape etc.)
Should take about a week, maybe 1.5 weeks tops (I will be helping.)
Attached picture is approximation of what I want deck to look like.
Discussion
By posting you agree to the Terms and Privacy Policy.