Description
hoping to find 1 person who can do it all
(1-2 days)
1. Remove luxury vinyl planks from house. About 1100 sq feet. Not glued down so requires removing baseboards and lifting floor up and stacking flooring on patio under cover. (we will be reselling the flooring)
*we can save the Baseboards and label/number them for the rooms they belong in
** house will be empty / no furniture
(2-3 days)
2. Install 12 sheets of drywall in garage (two side walls). mud, tape, sand, prep and paint.
*there is a utility sink and shelving that needs to be removed before installing drywall
please Text Derek at 619 852 1944
Discussion
By posting you agree to the Terms and Privacy Policy.