Description
I need a section of existing gravel driveway dug out. Appx 7.5 x 15.5 ft, need to excavate 7-8 inches deep. Ideal if you can also rototill and level to prepare for sod installation. Must haul away gravel & dirt.
Looking to hire in the next 2-3 weeks. Please contact by text or email with quote.
Discussion
By posting you agree to the Terms and Privacy Policy.