Description
Job Filled. ISO Laborer to prepare ground ahead of concrete project. Approx. 200 Sq. Ft. of area. Dig and remove 2" of soil then replace with 2" of road base. Also dig 6" deep trench approx 20" long for french drain. Also remove approx. 50# chunk of concrete.
Discussion
By posting you agree to the Terms and Privacy Policy.