Description
E Memorial Blvd at Gary Rd (former Taco Bell location)
2500 sq foot building requires complete perimeter repair of fascia boarding to meet Codes compliance
Approx. 225 running board feet perimeter of plumb 1 x 6 material
Specify
• Specify Material to be used + cost (may consider manufactured product)
• Labor cost to repair and install.
• Approximate time to complete.
SEND CONTACT DETAILS to discuss after inspection
Discussion
By posting you agree to the Terms and Privacy Policy.