This Saturday or Sunday (4/3, 4/4), offering a full day of pvc (or pex) supply pipe and fitting work near GPD.
Replace 3/4" buried supply from meter to under-house crawlspace, about 22' and 18" deep, including 30" under a walkway.
Continue supply another 33' to water filter setup, strapped to floor joists every 6'...you need to be comfortable in a dirt crawlspace; there is plenty of light to see by.
Then tie in to house water supply at an appropriate spot. If you've connected a four-component water softener/filter setup before, it would be helpful, but not required. Extra valve shutoffs likely to be needed.
Install a single-hole kitchen faucet.
Install an insinkerator (garbage disposal).
Replace two corroded in-cabinet shutoffs (valves).
Discussion
By posting you agree to the Terms and Privacy Policy.