Description
I received a home inspection report which is asking for the following:
Cut casing directly above hole Pull both jet lines from the well
Install packer below hole in casing
Replace foot valve on both jet lines
Replace pipe on both jet lines
Reinstall jet lines with 4" x 1" x 1" well seal
Apparently this is being called for because evidence of corrosion at the top of the well pipe. I'm looking for someone interested in quoting this work. Thank you
Discussion
By posting you agree to the Terms and Privacy Policy.