Local rehabber hiring plumbing subcontractor for small addition (453 sf) in Gaithersburg, MD.
Foundation starts 3/29. In-ground rough-ins start middle of next week, so we can pour the slab ASAP.
***WSSC permit in City of Gaithersburg required***
(License not required if you have someone to pull the permits for you.)
BUDGET:
- $4,500 labor and materials (fixtures by owner) (2/3 at rough-in inspection; 1/3 at finals).
SCHEDULE:
- In-ground plumbing rough-ins 3/31 - 4/2. Rest of plumbing is flexible.
SCOPE OF WORK:
- Permits and inspections.
- Rough-ins for addition (on slab-on-grade foundation).
- Replace supply and drain at existing bathroom (crawl space).
- Install fixtures.
OTHER INFO:
- Crawl space is clean with vapor barrier on ground.
- Property is unoccupied with lockbox.