Artist, fabricator, or skilled laborer needed for custom hotel install
Jobs
Louisville KY
Description
SCOPE: 4 art pieces installed in a hotel. 3 of the 4 already made. 4th needs full fabrication and install. BUDGET: Will discuss in interview (most materials already purchased) TIMELINE: 3/4 of art pieces to be installed by March 8th. 4th piece to be fabricated and installed by March 20th. DETAILS Looking for a skilled person who can build and install a custom art piece for a hotel in Louisville. Concept and design already finalized. Majority of materials already purchased. MUST BE SKILLED with wood working, framing, precise cutting, stud finding, mounting heavy plywood sheets on wall, adhesives, spackling, and painting. Tools needed: table saw or circular saw, impact driver, drill, sander, paint roller, chalk line, etc. It would be beneficial to have an assistant to help install (works are heavy). I am an artist based in San Francisco and started this project several months ago. Due to covid, delays happened, timelines shifted and I cannot finish the work or install it. I have NOT had covid or been exposed. There are 4 art aspects for this project. 3 of them are already complete and I will be shipping there, so you will have to install them. I will send detailed information in videos and docs, and I'd like to set up a zoom or phone call with you to walk through all the steps. The 4th art aspect is a large 16ft wide x 9ft tall art piece to be mounted on the wall. I have not started this one, and so you will have to take this on from start to finish. Again, I'll send info in videos and docs, and would like to have a few calls to go over the fabrication and installation plan. The large panel will be covered in small copper coins (glued), with the hotel's name in the middle with darkened coins. The copper coins are custom made and already paid for. I'll ship them to you. The patina solvent will be sent as well, so you can darken the coins needed for the hotel name. The hotel client wants the 3 finished art aspects installed ASAP. The coin wall will take some time to fabricate in a shop before installation. The client would like this finished and installed by March 21. INTERESTED?
Discussion
By posting you agree to the Terms and Privacy Policy.