Description
Need 40,000 simple tube fittings assembled in 2-3 weeks. Need 2-4 people who can do this.
There are 4 tubes with different thickness for total of 40,000
Steps are shown in attached images
1) Step 1: Push end-connectors tp the tube. Simple frame to hold connectors is provided.
2) Wrap cable ties (provided)
3) Flush cut cable tie with tool (provided)
All materials provided
Discussion
By posting you agree to the Terms and Privacy Policy.