Need a NH Licensed Master Electrician to do the electrical work for a new solar installation in Durham, NH. If you can also do the panel installation on the barn rooftop, that would be a plus, but not necessary for this job. I have an alternative for that part of the project.
The project includes the following:
1. Install and configure a Sol-Ark 15K Hybrid Inverter.
2. Assemble a battery bank consisting of a 4 LiPO4 48 volt batteries installed into a rack made to house the batteries. Batteries must be charged according to vendor specifications.
3. Connect AWG 10 gauge wiring for 4 PV strings from a junction box (to be installed) on the corner of the barn on which the panels will be mounted through previously installed and inspected 1 1/2" Schedule 40 PVC conduit to the house basement where the inverter will be installed.
4. Install a Tigo RSS Transmitter to control rapid shutdown at the panel level by Tigo TS-4's to be installed with each PV panel.
5. Connect the Sol-Ark 15K to the 4 PV strings, 200 amp input from the utility, output to the house main electrical panel, and connection of the battery bank.
6. Install EMP Shield devices for the PV string inputs to the inverter and for the battery input to the inverter.
7. Get permit approval for the electrical portion of the project, as outlined above (in Durham, NH).
8. Get approval from EverSource for power sell back to the utility and configure the Sol-Ark to support sell back.
Plus any additional details or requirements that you may identify.
The inverter, batteries, rack, Tigo equipment, and EMP Shield devices have already been purchased. A new 200 amp main panel has just been installed in the house. The project is ready to get started.